Kyzylorda Waste Management Project - Feasibility Study

The Project will also involve closure of the existing landfill (dumpsite) in appropriate manner as a condition of the Bank’s involvement in the Project. It is expected that modern technologies will be used at the Facilities to maximise the efficiency of the waste processing. The establishment of such Facilities would allow Kyzylorda to move away from the current uneconomic practices that have resulted in the accumulation of environmentally hazardous and non-compliant landfills. Additionally, it will result in lower CO2 and methane emissions and will safeguard renewable and non-renewable resources. According to the preliminary estimates the total investment cost is around EUR 36 million. This estimate is based on a similar type of project in the region.